Vent Air Supply Plenum Assembly Installation - MD Helicopters MD Explorer Servicing And Maintenance

Table of Contents

Advertisement

CSP−900RMM−2
B. Vent Air Supply Plenum Assembly
Installation
(Ref. Figure 204)
Consumable Materials
(Ref. CSP−SPM)
Item
Nomenclature
C205
Sealing Compound
NOTE:
If seal between duct assembly and deck
has been broken it is necessary to reseal the
duct assembly. Remove old sealant and
clean faying surfaces. Apply sealing com­
pound (C205) to faying surfaces and install
fasteners.
(1). Place vent air supply plenum assembly
(4) in position and install screws (9) and
washers (10) through roof deck duct
assembly (8). Torque screws (9).
Page 206
Original
MD Helicopters, Inc.
Rotorcraft Maintenance Manual
21-20-00
Sealing Compound (C205)
(2). Apply sealing compound (C205) to cover
faying surfaces between duct and deck
structure (Ref. CSP-SPM, Section
20-50-00).
(3). Connect plenum assembly flexible ducts
(6) to gasper assembly plenum caps (7)
with hose clamps (5). Torque hose
clamps (5).
(4). Connect flexible ducts (2 and 3) to
plenum assembly (4) with hose clamps
(1). Torque hose clamps (1).
(5). Install cabin compartment interior roof
panels (Ref. CSP-SPM, Section
25-20-00).
(6). Close left-hand forward access door
assembly L155 (Ref. Section 06-00-00).

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Csp-900rmm-2Mdhi md900

Table of Contents