Valve To Deck Tube Assembly (902 Config); Valve To Deck Tube Assembly Removal; Valve To Deck Tube Assembly Installation - MD Helicopters MD Explorer Servicing And Maintenance

Table of Contents

Advertisement

CSP−900RMM−2
15. Valve To Deck Tube Assembly (902
CONFIG)
A. Valve to Deck Tube Assembly Removal
(Ref. Figure 405)
(1). Open R260 (Ref. Section 06-00-00).
(2). Remove right aft station 230.00
bulkhead baggage compartment
interior trim insulation panels (Ref.
Section 25-50-00).
(3). Remove baggage compartment interior
trim roof insulation panel (Ref. Section
25-50-00).
(4). Remove clamp from tube (15).
(5). Disconnect coupling nuts (18) from
shutoff valve (13) and bulkhead union
(16).
Page 416
Revision 28
MD Helicopters, Inc.
Rotorcraft Maintenance Manual
21-40-00
(6). Remove tube (15).
B. Valve to Deck Tube Assembly Installation
(Ref. Figure 405)
(1). Install tube on valve and bulkhead
union.
(2). Connect coupling nuts. Torque coupling
nuts 500-600 in-lb (56.5-67.8 Nwm).
(3). Install clamp.
(4). Install right aft station 230.00 bulk­
head baggage compartment interior
trim insulation panels (Ref. Section
25-50-00).
(5). Install baggage compartment interior
trim roof insulation panel (Ref. Section
25-50-00).
(6). Close R260 (Ref. Section 06-00-00).

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Csp-900rmm-2Mdhi md900

Table of Contents