Re-Installating Engine
To re-install the engine, follow the instructions above in the
reverse order. However, pay close attention to the following
details :
Ensure that the 4 (per side) engine plate bolts are well
o
torqued to 37 N-m (27lbf-ft, 325 lbf-in). Loctite 243 is
recommended here.
Ensure the correct alignment of the clutches and the
o
preload/deflection of the drive belt.
Ensure that each cable, wire and hose is properly
o
connected and its original routing is used. (See Chapter
17 – Wire, Cable and Hose Routing for more details.)
Ensure that each coolant line is re-installed using the
o
original routing and that each hose clamp is well
tightened.
Re-fill the coolant reservoir to the Cold Level line before
o
attempting to start the vehicle. It is recommended to
elevate the front of the vehicle about 12 in. off the
ground when adding coolant to the system to ensure
that all of the air bubbles will escape. See Chapter 6 –
Cooling System for more details.
ENGINE REMOVAL 4-8