Diagnostics; Table 33: Led Diagnosis - WAGO SYSTEM 750 User Manual

3-phase power measurement module
Table of Contents

Advertisement

WAGO-I/O-SYSTEM 750
750-493 3-Phase Power Measurement Module
Pos : 95 /All e Seri en (Allgemei ne Module)/Ü berschriften für alle Serien/Diag nos e/Di agnos e - Ü bersc hrift 1 @ 4\mod_1240831069471_21.doc x @ 31372 @ 1 @ 1
9

Diagnostics

Pos : 96 /Serie 750 ( WAGO-I/O-SYST EM)/Di agnose/Bus kl emmen/Di agnose 750-0493 @ 15\mod_1366806737193_21.doc x @ 117960 @ @ 1
8 LEDs A ... H indicate the operation status and possible errors.
The meaning of the indications is as follows:

Table 33: LED Diagnosis

LED
A
B
C
D
E
F
G
H
*The undervoltage threshold is set on the tabs „Phase L1", „Phase L2" and „Phase L3".
Pos : 97 /D okumentation allgemei n/Glieder ungs elemente/---Seitenwechs el--- @ 3\mod_1221108045078_0.doc x @ 21810 @ @ 1
Manual
Version 1.2.0
Status
Message
No operational readiness or
Off
the internal data bus communication is interrupted.
Operational readiness and correct internal data bus
Green
communication
Off
No error
Red
Undervoltage L1 – N *
Off
No error
Red
Override of a current measuring path
Off
No error
High measuring error, caused by undervoltage
Red
of a voltage measuring path
Off
No error
Red
Undervoltage L2 – N *
Off
No error
Red
Undervoltage L3 – N *
Off
No error
Red
Override of a voltage measuring path
Off
No error
Yellow
Error of the phase sequence L1-L2-L3
Diagnostics
77

Advertisement

Table of Contents
loading

Table of Contents