Powering On The Switch; Checking Before Power-On - H3C S3100V2-52TP Installation Manual

Hide thumbs Also See for S3100V2-52TP:
Table of Contents

Advertisement

Click Properties in the HyperTerminal window to enter the Switch Properties dialog box. Click the
Step5
Settings tab, set the emulation to VT100, and then click OK.
Figure 22 Set terminal emulation in Switch Properties dialog box

Powering on the switch

Checking before power-on

Before powering on the switch, verify that:
The power cord is properly connected.
The power supply voltage meets the requirement of the switch.
The console cable is properly connected; the terminal or PC used for configuration has been started;
and the configuration parameters have been set.
Powering on the switch
After the S3100V2-52TP switch starts up, the following information is displayed on the terminal screen.
Starting......
************************************************************************
*
*
*
H3C S3100V2-52TP BOOTROM, Version 105
18
*
*
*

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the S3100V2-52TP and is the answer not in the manual?

Table of Contents