Load Segments

Load segments are sets of receptacles that can be controlled by power
management software, providing an orderly shutdown and startup of
your equipment. For example, during a power outage, you can keep key
pieces of equipment running while you turn off other equipment. This
feature allows you to save battery power. See your power management
software manual for details (refer to the Software Suite CD or
www.powerware.com for the latest information).
NOTE If power management software is not used, the individual load segments cannot be
controlled.
The E30 has two load segments as shown in Figure 34.
UPS with PDM: The PDM plugs into Load Segment 2 on the UPS rear
panel.
NOTE When the PDM is in Bypass mode, all load segments are switched to utility power
and cannot be controlled until the PDM bypass switch is returned to the NORMAL position.
Load Segment 1
Load Segment 2
Figure 34. UPS Load Segments
®
®