Installation; Unpacking And Inspection; Ups And Battery Cabinet Storage - Powerware Prestige 6000 Installation And Operator's Manual

Prestige series
Hide thumbs Also See for Prestige 6000:
Table of Contents

Advertisement

C H A P T E R 3
I
NSTALLATION
The following sections describe UPS storage requirements and the
installation and startup of the UPS.

Unpacking and Inspection

Carefully unpack the UPS and any other cabinets, making sure to retain
the packaging materials. Examine each unit carefully for any signs of
damage and immediately notify your distributor if damage is present.
For assistance with the IBM 9910 UPS, see Chapter 8, "Service and
Support" on page 75.

UPS and Battery Cabinet Storage

If you plan to store the UPS or battery cabinets prior to use, store them
in a cool, dry environment. Storage temperature should not exceed
35
energize the power processing unit and battery cabinet for
approximately 8 hours every 90 days in order to maintain battery
charge.
Whenever the units are not energized, verify the circuit breaker on all
battery cabinets is returned to the OFF (O) position (see Figure 9 on
page 36).
Powerware
®
Prestige Series Installation and Operator's Manual for IBM Applications (6000 VA) Uncontrolled Copy
C (95
F) in order to preserve battery life. For longer term storage,
31

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents