Dunkirk XEB-2 Installation Instructions Manual page 6

Gas-fired hot water induced craft boilers
Table of Contents

Advertisement

.
One permanent opening commencing with 12
inches of the top of the enclosure,
shall be
permitted where the equipment has clearance
of at least 1 inch from the sides and back and
6 inches form the front of the appliance. The
opening shell directly communicate
with the
outdoors or shall communicate through a vertical
or horizontal duct to the outdoors or spaces
(crawl or attic) that freely communicate
with
the out doors, and shall have a minimum free
area of:
a) 1 sq. inch per 3000 Btu per hour of the total
input of all equipment located in the enclosure
(See Fig. 4), and the front of the appliance
b) Not less than the sum of the areas of all
vent connectors in the confined space.
1 Square Inch )er 4,000 Btuh
100% Free
75% Free
25% Free
Area
Area
Area
Fresh Air
1/4" Wire
Metal
Wood
Duct Size
Mesh
Louvers
Louvers
3" x 12"
144,000
108,000
36,000
8" x 8"
256,000
192,000
64,000
8" x 12"
384,000
288,000
96,000
81/2" x 16"
512,000
384,000
128,000
1 Square Inch )er 2,000 Btuh
100% Free
75% Free
25% Free
Area
Area
Area
Fresh Air
1/4" Wire
Metal
Wood
Duct Size
Mesh
Louvers
Louvers
3" x 12"
72,000
54,000
18,000
8" x 8"
128,000
96,000
32,000
8" x 12"
192,000
144,000
48,000
81/2" x 16"
256,000
192,000
64,000
1 Square Inch )er 3,000 Btuh
100% Free
75% Free
25% Free
Area
Area
Area
Fresh Air
1/4" Wire
Metal
Wood
Duct Size
Mesh
Louvers
Louvers
3" x 12"
108,000
81,000
27,000
8" x 8"
192,000
144,000
48,000
8" x 12"
288,000
216,000
72,000
81/2" x 16"
384,000
288,000
96,000
5

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xeb-3Xeb-6Xeb-7Xeb-4Xeb-5

Table of Contents