d) ProTechstainless steel vent piping requires
one loose fitting FasNSeal support strap
(#FSSH) for every 6' of horizontal vent.
10. If the horizontal vent must go through a crawl
space or other unheated space, the cool
temperatures will likely cause the flue gases
to continuously condense insidethe vent pipe.
Do not insulate the vent pipe. It must be visible
for monthly inspection. Insure that the vent
pipe is properly pitched away from the boiler,
with no low spots, so that condensate in the
11.
ventwill drainawayfrom the boiler.An insulated
enclosure or chase, with access for inspection
and servicing of the vent, may be required to
prevent freezing of liquid condensate. Consult
the vent pipe manufacturer's instructions for
specific guidelines.
At the beginning of each heating season and
monthly during the heating season, check all
vent pipes and the vent terminal to make sure
there are no obstructions. Periodically clean
the screen in the vent terminal.
Horizontal venting with a power venter is an
alternate method of sidewall venting. This boilers
CSA listed for sidewall venting with standard
single wall galvanized or Type B vent pipe when
using the following power venter kits, which were
specifically sized for these boilers:
Number of
Field Controls
Boiler Sections
Kit
Power
Venter
2, 3, 4, 5
SWG-4D
6, 7
SWG-5D
Some possible
reasons for using a power venter
for sidewall
venting:
1. May be preferred
by local codes.
2. Need a vent piping run beyond
30' (but
not more than 50').
3. The boiler installation
site experiences
gusting or high winds. A power venter can
help prevent the boiler from short cycling
due to gusting or high winds by providing
vent exhaust pressures
greater than the
boiler's induced draft blower alone.
4. When installers
or homeowner's
prefer a
negative
pressure vent system instead of
a positive
pressure
vent system.
5. May be more cost effective than stainless
steel venting, particularly
at longer vent
lengths.
The Field Controls power vent kit includes either
a SWG-II-4HD
or SWG-II-5
power venter, a
MG-1 4" barometric
draft controller, and the
CK-43D controls kit.
Confirm that installing a power venter is an option
allowed by local codes. Follow the specific power
venter
installation
instructions
issued
with the
power venter
kits. Although
the power venter is
equipped
with its own fan, the fan on the boiler
remains
in place and is unaltered
when a power
venter is used. When sidewall venting, flue gases
must
be vented
to a point
in relation
to the
prevailing
wind so that they may freely disperse
without being blown back at the building causing
discoloration,
or into the building
through
doors
or windows
causing
odors. Also, under certain
conditions
flue gases
will condense,
forming
moisture.
In such cases, steps should
be taken
to prevent building
materials
at the vent terminal
from being damaged
by the exhausted
flue gas.
When installing
single wall galvanized
vent pipe
for power
venting
follow
the specific
power
venter installation
instructions
for layout, location
of the barometric
draft control
and termination
connections.
When joining and sealing the single
wall galvanized
or Type B vent piping,
use RTV
silicone
sealant
with a minimum
temperature
rating of 400°F. For 3" vent pipe runs, begin with
the female end of the vent pipe over the boiler's
induced draft blower outlet. For 4" vent pipe runs
begin with the galvanized
3" to 4" increaser fitting
(included
in the boiler's
parts
bag) over
the
induced
draft
blower
outlet.
Then
follow
by
placing
the female
end of the 4" vent pipe over
the increaser fitting. When joining pieces of single
wall galvanized
vent pipe, a substantial
bead of
silicone
should be used at the joint to insure a
leakproof
connection.