3) Insertthe maleend of one into the female end
of the other. Push the pipe together so the
female end rests up against the stop bead of
the male end.
4) Insert a StaR-JoinerBand into the inlet of the
beaded channel. Feed the Joiner Band in so it
makesitswayaroundthe pipe,backtothechannel
inlet and it overlapsitself by about 1/2".
5) Cut the excess Joiner Band so it lays flat in
the beadedchannel. Fillthe inlet ofthe beaded
channelwith high temperaturesilicone.Smooth
out the silicone over the channel inlet and the
silicone between the female end and the stop
bead of the male end.
6) Horizontalventing shall have a slope not less
than 1/4" (6.4mm) every 12 inches (305mm)
downward away from the boiler to prevent
collection ofcondensate throughout t heassembly.
7) Allow the sealant to cure for 24 hours before
operating the appliance.
D. For ProTech
Systems
FasNSeal
stainless
steel vent pipe no cleaning
fluid is required.
For 3" vent pipe runs on 2, 3, 4 and 5 section
boilers begin by locating the FasNSeal Ametek
Adapter
(part #FSAMETEK)
over the boiler's
induced draft blower. Continue the vent pipe run
with 3" FasNSeal
vent pipe. For 6 and 7 section
boilers begin by locating the FasNSeal Ametek
Adapter
(part #FSAMETEK)
over the boiler's
induced
draft
blower.
Then
connect
a
FasNSeal
3" to 4" increaser
(part #FS341)
to
the 3" adapter
outlet.
Continue
the vent pipe
run with 4" FasNSeal
vent pipe. Other than
the Ametek Adapter
and increaser
fitting, DO
NOT use 3" vent pipe on 6 or 7 section boilers.
FasNSeal
vent pipe is joined
and sealed
by
the use of an internal
sealing
gasket
and a
locking band on the female
end of each vent
pipe. All components
should be examined
for
possible shipping
damage
prior to installation.
Align all vent pipe seams and orient upward in
all horizontal
applications.
Adjustable
vent
lengths
are available
for 4" diameter
vent
piping. For 3" diameter
vent piping, square cut
male end at the desired length. For 2, 3, 4 and
5 section boilers using the VH-1-3"
vent hood,
connect the FasNSeal Vent to the VH-1-3" vent
hood using FasNSealAdapter
#FSC-DUN-3.
This adapter
has no internal
sealing gasket.
15
To attach
the adapter
to the vent hood, crimp
the 3" vent hood pipe, apply a 1/4" bead of high
temperature
red silicone
sealant
around
the
outside
of the vent hood's
crimped
connecting
pipe and a similar
bead
of high temperature
silicone
around
the inside
of the FasNSeal
adapter.
After
pressing
the two pipes together
and tightening
the locking band, finish creating a
complete
seal by filling the FasNSeal
adapter's
notched
hole with high temperature
silicone.
For 6 and 7 section boilers using the VH-1 -4" vent
hood, an adapter is not required. The 4" FasNSeal
vent pipe connects
directly to the VH-1-4"
vent
hood, and is joined and sealed bythe internal gasket
and locking band.
To join and seal the FasNSeal
vent
pipe:
1) Insert male end into female
section.
2) Push the units together as far as possible.
3) Firmly tighten locking band with a nut driver.
4) DO NOT penetrate
the FasNSeal
vent pipe
with fasteners.
5) Horizontal ventingshall have a slope of not lessthan
1/4" (6.4mm).every 12 inches (305mm) downward
away from the boiler to prevent the collection of
condensate throughout the assembly.
9. Support
Spacing:
Do not restrict thermal
expansion
movement
of the vent. The vent pipe must expand
and
contract freely with temperature
change. Each
run of vent
piping
shall
be supported
as
follows:
a) Z-Flex
stainless
steel vent piping requires
a loose fitting metal strap or similar support
at each
joint
at a maximum
of 4 feet
between
supports.
b) Heat-Fab stainless steel vent piping requires
a support for every 6 feet of horizontal
piping
run. The support
must be secured
using at
least #10 fasteners
to a solid material (solid
masonry
or woodframing
or blocking.)
Do
not fasten to drywall sheathing
using hollow
wall anchors.
Each support will be 1 1/2 inch
lower
than
the
previous
support
when
spaced
6 feet apart.
c) Flex-L stainless
steel vent piping requires
a loose fitting metal strap or similar support
at each
joint
at a maximum
of 4 feet
between
supports.