Dunkirk XEB-2 Installation Instructions Manual page 10

Gas-fired hot water induced craft boilers
Table of Contents

Advertisement

If boiler is installed with single wall vent, it must
have a 6" clearance between its surface and any
combustible material. A new Type B gas vent
orflexible liner must be installed in accordance
with the instructions furnished with the vent.
Maintain clearancesas specifiedfor the vent pipe.
Check the vent pipe to see if it is firestopped
where it goes through the floor or ceiling. It
should
have an approved
vent cap with
clearances from the roof as shown in Fig. 8. If
clearances are less than shown in Fig. 8, have
the vent checked by local authorities.
For boilers
for connection
to gas vents
or
chimneys,
vent
installations
shall
be in
accordance
with Part 7, Venting
Equipment,
of the national
Fuel Gas Code, ANSI Z223.1-
latest issue and applicable
provisions
of the
local building
codes.
In Canada,
follow
CSA
13149.1
or .2 Installation
Codes.
Vent connectors
serving
appliances
vented
by natural
draft shall not be connected
into
any
portion
of mechanical
draft
systems
operating
under positive
pressure.
............ _
LINER
jJ
J
jJ
..... /
....
.
I(Y
\\
lEE-
'iET
I I:
I [ I
©
©

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xeb-3Xeb-6Xeb-7Xeb-4Xeb-5

Table of Contents