Dunkirk XEB-2 Installation Instructions Manual page 30

Gas-fired hot water induced craft boilers
Table of Contents

Advertisement

FOR USE WITH NATURAL GAS ONLY
6A
I
I
NOTE:
Actual
gas valve may look
different
than gas valve shown
NATURAL
GAS BURNER
& MANIFOLD
PARTS
THIS IS A REPAIR PARTS LIST-
NOT A PACKING
LIST
KEY
NO.
1
2
3
4
5
6
6A
7
DESCRIPTION
24 Volt Gas Valve, Natural Gas
Pilot Tube
10-32 x 3/16" Slotted Hex Head Screws
Gas Manifold
Orifice - Natural Gas*
Main Burner Less Pilot Bracket**
Main Burner with Pilot Bracket
Pilot Burner with Orifice, Natural Gas
RolIout Shield
2
Section
146-62-062
146-15-005
146-95-301
146-16-020
146-15-044
146-15-531
146-62-094
425-00-932
3
Section
146-62-062
146-15-005
146-95-301
146-16-021
146-15-036
146-15-032
146-15-531
146-62-094
425-00-933
PART NUMBERS FOR
4
5
Section
Section
146-62-062
146-62-062
146-15-005
146-15-005
146-95-301
146-95-301
146-16-022
146-16-023
146-15-036
146-15-036
146-15-032
146-15-032
146-15-531
146-15-531
146-62-094
146-62-094
425-00-934
425-00-935
6
Section
146-62-059
146-15-006
146-95-301
146-16-024
146-15-036
146-15-032
146-15-531
146-62-094
425-00-936
:I: Not illustrated.
Quantity is 1 unless otherwise noted.
*Requires 1 less than the number of sections.
**Requires 2 less than the number of sections.
7
Section
146-62-059
146-15-006
146-95-301
146-16-025
146-15-036
146-15-032
146-15-531
146-62-094
425-00-937
29

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xeb-3Xeb-6Xeb-7Xeb-4Xeb-5

Table of Contents