B. For Heat-Fab
Saf-T-Vent
stainless
steel
vent pipe use a high temperature
red silicone
sealant
rated for 500°F The outside
of the
male end and inside of the female end of the
pipe must be cleaned
before
applying
the
silicone bead. For 3" vent pipe runs, the male
end of the vent pipe which goes over the outlet
of the boiler's
induced
draft blower
must be
crimped.
The vent pipe should
be crimped
as minimal
as possible
to provide
a tight fit
over the outlet. After crimping
is completed
C.
follow the instructions
for applying
silicone
sealant.
For 4" vent pipe runs, begin with a
Saf-T-Vent
3"
to
4"
increaser
fitting
(#7374GC)
over the boiler's
induced
draft
blower outlet, to which an even bead of high
temperature
silicone
sealant
should
be
applied. Then continue the 4" Saf-T-Vent
pipe
run by connecting
the 4" male end of the Saf-
T-Vent to the increaser.
(A locking band may
be used
around
this joint
for additional
support.)
The
vent
flow
must
bein
the
direction
indicated
on the vent pipe. When
using the Tjernlund VH-1 vent hood, the female
end (flared
end)
of the vent
pipe will
be
connected
to the termination
hood. Apply high
temperature
silicone
in an even
1/4" bead
approximately
1/4" to 3/8" from the end of
the vent hood's connecting
vent pipe. Also,
run a similar
size bead of silicone
sealant
down the seam weld of the vent pipe. Then
push the female
end over the vent hood's
connecting
vent pipe.
1) Apply the high temperature
silicone around
the male end of the pipe (without the tabs)
in an even W' bead. Silicone bead should be
approximately
1/4" to 3/8" from the end of
the male end. Also, run a similar size bead
of silicone
sealant down the seam weld at
the end of each joint.
2) Pipes can now be pushed together as far as
they will go. The seams on the vent pipe should
be aligned
and oriented
upward
in all
horizontal appliances. With a moistened finger
or flat tool, spread any sealant that squeezes
out around the circumference
of the joint.
3) Attach
the sections
together
with
the
locking rings and tabs (except at the blower
outlet where
no locking
ring exists.)
14
Inspect the joint to ensure that flue gases
will not leak. If necessary
apply additional
sealant around
the joint.
4) Horizontal
venting
shall have a slope not
less than
1/4" (6.4mm)
every
12 inches
(305mm)
downward
away from the boiler
to
prevent
collection
of condensate
throughout
the assembly.
5)
Allow
the sealant
to cure for 24 hours
before operating
the appliance.
For Flex-L
StaR-34
stainless
steel
vent
pipe
use a high temperature
red silicone
sealant
rated
for 500°F.
Before
applying
silicone,
the outside
of the male end and
inside of the female end of the pipe must be
cleaned using a cleaner, such as methyl ethyl
ketone
(MEK)
or naptha.
For 3" vent pipe
runs, begin with the male end of the vent pipe
over the boiler's
induced
draft blower outlet.
For 4" vent pipe runs begin with a StaR-34 3"
to 4" increaser
fitting
(#SR10304)
over the
boiler's
induced draft blower outlet. For both
3" and 4" vent pipe runs, apply a bead
of
silicone
sealant around the blower outlet and
around
the
inside
of the male end of vent
pipe going
over the blower's
outlet.
When
using the Tjernlund VH-1 vent hood, the female
end (flared
end)
of the vent
pipe will
be
connected
to the termination
hood. Apply high
temperature
silicone
in an even %4 '_ bead
approximately
1/4"from
the end of the vent
hood's connecting vent pipe. Also, run a similar
size bead of silicone sealant
down the seam
weld of the vent pipe. Then push the female
end over the vent hood's connecting
vent pipe.
Now fill in the channel inlet with silicone sealant.
Do not try to insert the joiner
band, instead
fasten the vent pipe to the vent hood's
pipe
with a steel gear clamp.
1) Apply the high temperature
silicone around
the male end of the pipe in an even 1/4"
bead. Silicone bead should be approximately
1/4" from the end of the male end. Also, run
a similar size bead of silicone sealant down
the seam weld at the end of each joint.
2) The seams
on the vent pipe should
be
aligned and oriented upward in all horizontal
vent pipe runs.