Dunkirk XEB-2 Installation Instructions Manual page 27

Gas-fired hot water induced craft boilers
Table of Contents

Advertisement

CLEANING
YOUR
BOILER
AND
BURNERS
Flue passages
between
sections
should
be
examined
yearly and cleaned
if necessary.
To
clean,
remove
burners,
pilot
and vent
pipe.
Remove
top and front jacket
panels.
Split the
silicone
seal on the flue collector
and the clean
out plates with a razor knife. Remove flue collector.
Remove
clean out plates by tapping upwards
on
the bottom of the plate with a hammer.
Remove
loose silicone sealant from sections, flue collector,
and
clean
out plates.
Clean
passageways
between sections with a flexible handle wire brush
and a straightened
out wire coat hanger. Remove
dirt from
the
bottom
of the boiler
and from
between
sections
by vacuuming.
Make sure all
flame ports in burners are open and clear. Shake
out or blow out all loose dirt in burners. Reassemble
all parts. Seal flue collector and clean out plates to
sections with silicone sealant (400 ° F RTV silicone
sealant
or equivalent).
Reseal
seams
between
adjacent sections where necessary. All joints must
be airtight.
Be sure to check tightness
of pilot
connections
and condition
of burner flames after
reassembly
(see Figure
16). Be sure vent pipe
connections
to chimney
are
secure
and no
obstructions
are present.
BLOWER
The blower motor features a permanently lubricated
ball bearing
construction.
Lubrication
is not
required.
CIRCULATOR PUMP ISOLATION VALVES
The isolation valves in the circulator pump flanges
should
be operated manually
once or twice per
year to prevent the valves from becoming
stuck in
the open position. Rotate the valves from the open
position
to the closed position
and back to the
open position.
,, OUTER
HAW
_L
/
/
//
/
" " /. _6 A,A ( (' ! i"
6 '_"
_("(
/
)(
{
/
x
x
X
//
--S
ARP
INN-
CONES
26

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xeb-3Xeb-6Xeb-7Xeb-4Xeb-5

Table of Contents