All electrical work must conform to local codes as
well as the National Electrical Code, ANSI/NFPA-70,
latest revision. In Canada, electrical wiring shall comply
with the Canadian Electrical Code, CSA-C22.1.
ELECTRIC
POWER SUPPLY
Run a separate
120 volt circuit from a separate
overcurrent protective device in the electrical service
entrance panel. This should be a 15 ampere circuit.
Locate a shut-off switch at the boiler. It must be turned
off during any maintenance. Connect 120 volt power
supply to aquastat terminals L1 (HOT) and L2.
The boiler, when installed,
must be electrically
grounded
in accordance with the requirements
of
the authority having jurisdiction or, in the absence of
such requirements, with the National Electrical Code,
ANSI/NFPA No. 70-latest revision. Run a 14 gauge
or heavier copper wire from the boiler to a grounded
connection in the service panel or a properly driven
and electrically grounded ground rod.
WARNING
Tum off electric power at fuse box before making any
line voltage connections. Follow local electrical codes.
INSTALL YOUR THERMOSTAT
The thermostat location has an important effect on the
operationof yourboilersystem BE SURETO FOLLOWTHE
INSTRUCTIONSINCLUDEDWITHYOUR THERMOSTAT
Locatethe thermostat aboutfive feet above the floor on an
inside wall. tt may be mounted directly on the wall or on a
vertically mounted outlet box. Itshould besensing average
roomtemperature,so avoidthe following:
DEAD SPOTS:
Behind doors
Corners and alcoves
HOTSPOTS:
Concealedpipes
Fireplace
TV sets
Radios
Lamps
Directsunlight
Kitchens
COLD SPOTS:
Concealedpipes or ducts
Stairwells- drafts
Doors-drafts
Unheated room on other side of wall
Set heat anticipatorat .2 amps.24 volt thermostatconnects
to aquastatterminals T and T
1. Thermostat calls for heat, powering the 1K relay
coil and closing contacts
1 K1 and 1 K2.
2. Circulator
pump is powered through terminals
C1 and C2.3. Induced draft blower and AT140C
transformer
primary
are
powered
through
terminals
B1 and B2.
4. When
blower
gets up to speed
and blower
suction
pressure
reaches
pressure
switch
setpoint, pressure switch contacts close sending
24 volts to $8600 intermittent
pilot control from
AT140C transformer
secondary.
5. Pilot gas valve opens and spark initiates to light
pilot burner. 6. When pilot flame is proven, spark
drops out.
7. Main gas valve opens and pilot burner ignites
main burners.
8. If boiler water temperature
reaches high limit
setpoint, high limit contacts B-R open, cutting power
to blower and $8600 intermittent pilot control.
Burners extinguish and blower stops. Circulator
pump continues to run as long as the thermostat
continues
to call for heat. When boiler water
temperature
drops past the high limit setpoint
and through the differential,
high limit contacts
B-R close, repeating
steps 3-7.
9. If venting
system
becomes
blocked,
blower
suction pressure will drop below the pressure
switch setpoint,
opening the pressure
switch
contacts
and cutting
power
to the $8600
intermittent pilot control. Burners will extinguish,
but blower will remain powered
as long as the
thermostat
continues to call for heat. If venting
system clears, steps 4-7 will repeat.
10. Thermostat
is satisfied,
ending call for heat.
Relay coil 1 K is de-energized,
opening
1K1
and 1K2 contacts. Burners extinguish.
Blower
and circulator pump stop.