Dunkirk XEB-2 Installation Instructions Manual page 13

Gas-fired hot water induced craft boilers
Table of Contents

Advertisement

1. These
boilers may be vented
horizontally
as
shown in Fig. 9. The vent pipe is pitchedl[!_!_fJm
from the boiler to the vent termination.
Do not
connect
other appliances
to this vent.
2. Vent Pipe Material:
a) UL Listed Z-Flex Z-Vent stainless steel vent
pipe from boiler to vent termination,
-or-
b)
UL Listed Heat-FabSaf-T-Vent
stainless steel
vent pipe from boiler to vent termination,
-or-
c) UL Listed Flex-L StaR-34 stainless steel vent
pipe from boiler to vent termination,
-or-
d) UL Listed ProTech FasNSeal
stainless steel
vent pipe from boiler to vent termination.
3. Clearance to Combustible
Materials:
For stainless steel vent pipe maintain 6" minimum
air space clearance to combustible
materials.
4. Vent Pipe Size:
a) 2, 3, 4 and 5 section boilers use 3" vent pipe
connected directly to the outlet of the induced
draft blower.
b) 6 and 7 section
boilers
use 4" vent pipe,
starting with a 3" to 4" stainless
steel vent
pipe transition
that is connected
directly to
the outlet of the induced draft blower. Do not
use 3" vent pipe on 6 or 7 section
boilers.
5. Vent Pipe Length:
a) For stainless
steel vent pipe, the maximum
horizontal
vent length is 30 feet plus one 90 °
elbow plus termination
fitting.
b) Minimum
horizontal
vent length for all vent
materials
is 2 feet plus one 90 ° elbow plus
termination
fitting.
c) For additional
elbows reduce the maximum
vent length as shown:
3"- 90° ebow- reduce vent len91h3 feet per each 3"
elbow,
4" - 90 ° elbow - reduce vent length 6 feet per
each 4" elbow.
Example:
6 section boiler requires 3 elbows
plus the termination
fitting. This means
2
additional
4" elbows will be used, at 6 feet
per elbow. This is equivalent
to 12 feet of
pipe (2 x 6 =12), therefore
maximum
vent
length is now 18 feet (30 -12 =18).
12
6. Vent Termination
Fitting:
For all vent pipe materials,
you may use either:
a) a 90 ° elbow
pointing
down,
fitted
with a
minimum
1/4" mesh
screen
to keep
out
rodents and birds. The elbow shall be of the
same
material and size as vent pipe. The
elbow exit should be at least 6" away from
exterior wall as shown in Figure 9.
-or-
b)
Tjernlund
VH-1 Series side wall vent hood.
For 2, 3, 4, 5 section boilers use VH-1-3", For
6, 7 section boilers use VH-1-4".
7. Vent Pipe Termination
Location:
a) When
venting
through
combustible
walls,
combustible
clearances
must be considered.
The VH-1 Side wall vent hood provides both
the outside
vent termination
and a double
wall pipe for passing
through a combustible
wall up to 8" thick (VH-1-4")
or 9" thick (VH-
1-3"). The hole in the wall must be 6%" square
for 3" vent pipe and 7 1/2" square for 4" vent
pipe, in order to insert the VH-1 side wall
vent hood. The VH-1 may also be used in
noncombustible
walls.
b) If the 90' elbow
is the termination
fitting of
choice, then the single wall pipe will be passing
through the side wall. For combustible
walls,
a UL listed thimble shall be used where the
single wall pipe passes through the wall. For
combustible
walls using Z-Vent, Sat-T-Vent,
or StaR-34 vent pipe, use the following:
3" vent
pipe
- use Simpson's
Duravent
#905295
3" thimble or equivalent
4" vent
pipe
- use Simpson's
Duravent
#915295
4" thimble or equivalent
Maximum
wall thickness with this thimble is 7 inches.
For
combustible
walls
using
ProTech
FasNSeal where the single wall vent pipe must
pass
through
the side wall,
a UL Listed
FasNSeal
wall thimble
shall be used as
follows:
3" FasNSeal vent pipe - use 3" FasNSeal Wall
Thimble #FSWT03 4" FasNSeal vent pipe - use
4" FasNSeal Wall Thimble #FSWT04
The thimble
is adjustable
for different
wall
thickness,
with a maximum
wall thickness
of
7 inches. Seal the thimble along the outside
edge of the plate with caulk or silicone
and
fasten to the wall with screws or nails.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Xeb-3Xeb-6Xeb-7Xeb-4Xeb-5

Table of Contents