Preparing For Recharging - Outback Power Systems MX60 Installation, Programming, And User's Manual

Maximum power point tracking charge controller
Hide thumbs Also See for MX60:
Table of Contents

Advertisement

PREPARING FOR RECHARGING

PV 113 V
Bat 12.5 V
00.0 A
Watts 0000
Aux
kWHrs 00.0
Sleeping
PV 087 V
Bat 12.5 V
05.0 A
Watts 0412
Aux Off
kWHrs 00.0
B-MPPT
OutBack Power Systems Inc.
Turn the PV input breaker on. The MX60
automatically detects the PV input voltage.
00.0 A
(Note: If PV voltage registers "000V" when the breaker
Off
is on, please check the polarity of the PV wires.)
After 5 seconds of stable input voltage, the MX60
enters a "Wakeup" stage, transitions to "Sweeping"
32.9 A
and prepares to charge the batteries by tracking the
MPP of the solar array.
19

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Mx60 pv mppt

Table of Contents