NEC Express5800/R320a-E4 User Manual page 170

Hide thumbs Also See for Express5800/R320a-E4:
Table of Contents

Advertisement

5-40 Installing and Using Utilities
Procedure in NEC ESMPRO Manager
Start
1.
Select the target component in the [ft] tree.
2.
Check the current state with the "Status" display on the target component screen.
3.
Click the [Bring Up] button in the [Maintenance] screen for the target component.
A certain time is required for the start.
The start result can be verified by "State" on the target component screen. The result of
the start operation is reported by the NEC Express5800/ft series as an alert.
Stop
Perform the procedure below before replacing a component.
1.
Select the target component in the [ft] tree.
2.
Check the current state with the "State" display on the target component screen.
3.
Click the [Bring Down] button in the [Maintenance] screen for the target component.
A certain time is required for the stop.
The stop result can be verified by "State" on the target component screen. The result of
the stop operation is reported by the NEC Express5800/ft series as an alert.
Sample screen of NEC ESMPRO Manager 1
[Maintenance] screen of PCI module
[CPU Module] – [CPU Module] - [Maintenance]

Advertisement

Table of Contents

Troubleshooting

loading

This manual is also suitable for:

Express5800/r320a-m4

Table of Contents