Hydrostatic Drive Belt Installation
1. Properly route the belt around the (2) hydro input
pulleys, the drive pulley and (2) tensioner / idler
pulleys (Fig. 056).
Drive Belt Routing - bottom view
Fig. 056
2. Install the drive belt tensioner spring as oriented
below (Fig. 057).
Fig. 057
3. Install the PTO belt around the PTO clutch.
4. Verify proper PTO belt routing and install the PTO
belt tensioner spring. See "PTO Belt Replacement
and Belt Routing" on page 6-6.
5. Safely lower unit and verify proper operation.
Toro Timecutter SW/SWX Service Manual
HYDROSTATIC DRIVE SYSTEM
Transaxle Replacement
Transaxle Removal
(RH side shown)
1. Disconnect battery terminals.
2. Safely raise and support unit by rear frame / bumper
so rear wheels are off the ground.
3. Remove rear wheels.
4. Remove the rear hydro rod mounting nut (Fig. 058).
PICT-1093
5. Remove the bypass lever clip and washer(s).
Remove the bypass lever from the unit (Fig. 059).
(MX shown)
PICT-1091
Fig. 058
PICT-1097
Fig. 059
PICT-1096
5