IBM iSeries 270 Service Manual page 58

Sb2 and sb3 hardware
Table of Contents

Advertisement

6. Unplug the cables that come from the power supply (located on the right side of the system), cables
that connect to the disk unit cages, control panel function cables, and the cables running to the rear
bulk head (located on the left side of the system).
7. Remove the plastic PCI card separators.
8. Remove the integrated Ethernet port bulkhead.
Figure 2. Ethernet port bulkhead
46
Hardware (Remove and Replace; Part Locations and Listings)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents