Engine Mount Installation; Installing The Stopper Assembly - Seagull Models CAP 232 Assembly Manual

Hide thumbs Also See for CAP 232:
Table of Contents

Advertisement

CAP 232.

ENGINE MOUNT INSTALLATION.

See pictures below.Make yourself the
template of your engine on paper.
M4 x 30mm.
Mark and drill 4 holes for engine mount.
Insert 4 blind nuts to firewall.
Thread locker glue.
6
Diameter =5.5mm.
Instruction Manual

INSTALLING THE STOPPER ASSEMBLY.

1) Using a modeling knife, carefully cut
off the rear portion of one of the 3 nylon tubes
leaving 1/2" protruding from the rear of the
stopper. This will be the fuel pick up tube.
2) Using a modeling knife, cut one length
of silicon fuel line. Connect one end of the line
to the weighted fuel pick up and the other end
to the nylon pick up tube.(The silicon tube is
not included).
3) Carefully bend the second nylon tube
up at a 45º angle. This tube is the vent tube.

Advertisement

Table of Contents
loading

Table of Contents