Fujitsu M2266S Technical Handbook page 67

Table of Contents

Advertisement

M2266S/H
Technical Handbook
Warning:
To avoid possible electrocution, be sure that system power is off before
connecting or disconnecting cables. Do not connect or disconnect cables
when power is on.
1. Connect the DC ground cable, if required to decrease ground noise.
2. Connect the power cable.
3. Connect the external operator panel, if required for the system.
4. Connect the SCSI cable.
5. Fix the cables so that they do not touch the DE and PCAs, or so that the
smooth flow of the cooling air in the system cabinet is assured.
Note:
Be careful of the insertion directions of the SCSI connectors. With the
system in which the terminating resistor power is supplied by means of
the SCSI cable, if the power is turned on, the over-current protection
fuse of the terminating resistor power supplier may be blown or the
cable may be burnt if over-current protection is not provided.
Confirming Operations after Installation
This section describes expected operation after power is turned on and areas
to check if you have problems during installation. These procedures apply
to the default setting of motor-start mode; that is, the spindle motor starts
when power is turned on. If you have set the condition to cause the motor
to start with the START command, then the text that follows assumes that
the START command from the interface has been issued.
Expected Operation at Power-on
• When power is turned on, the IDD executes initial self-diagnosis.
• If an error is detected in the initial self-diagnosis, the LED on the front
panel blinks. The spindle motor may or may not start rotating in this
stage.
3-20
FS810125-01 . . . A
Fujitsu America, Inc.

Advertisement

Table of Contents
loading

This manual is also suitable for:

M2266h

Table of Contents