• Hole for mounting screw
[Surface TI
[Surface SI
• Cable connection (M2266H)
[Surface P1
Cable connection (M2266S)
• SG pin
• Setting terminal
• External operator panel
connection
[Surface RI
M2266S/H
Technical Handbook
Service Clearance Area
Figure 2.7 shows the service clearance area, which must be accessible during
IDD installation or maintenance.
• External operator
[Surface Qi
panel connection
• SCSI terminating resistor
• Setting terminal, test pin
• Hole for mounting screw
Figure 2.7 Service Clearance Area
Power Supply Requirements
Allowable Input Voltage and Current
The power supply input voltage measured at the power supply connector
pin at the receiving end of the IDD must satisfy the requirement given in
Table 5.3.
Current Waveform
Figure 2.8 shows the waveform of +I2VDC.
Fujitsu America, Inc.
FS810125-01 ... A
2-7