Vent Termination Clearances - kozy heat Alpha ALP-36-L Installation And Operation Manual

Direct vent gas fireplase
Hide thumbs Also See for Alpha ALP-36-L:
Table of Contents

Advertisement

VENT TERMINATION CLEARANCES

Roof Pitch
Flat to 6/12
Over 6/12 to 7/12
Over 7/12 to 8/12
Over 8/12 to 9/12
Over 9/12 to 10/12
Over 10/12 to 11/12
Over 11/12 to 12/12
Over 12/12 to 14/12
Over 14/12 to 16/12
Over 16/12 to 18/12
Over 18/12 to 20/12
Over 20/12 to 21/12
CAUTION
This appliance must not be connected to or joined with any chimney flue serving any other appliance.
H - Minimum height from roof to lowest discharge opening
* If vent is closer than 12 in. (305mm), it must terminate at
least 2ft. (0.61m) higher than any portion of a building within
10ft. (3.05m) of the vent.
Approved Cap
Discharge opening
Approved vent pipe
Figure 26a
VENTING
H (Min.) Ft.
H (Min.) m
1.0
0.30
1.25
0.38
1.5
0.46
2.0
0.61
2.5
0.76
3.25
0.99
4.0
1.22
5.0
1.52
6.0
1.83
7.0
2.13
7.5
2.27
8.0
2.44
(Vertical Cap Requirements)
Minimum
*12 in. (305mm)
H
26
X
Roof pitch = X/12
12

Advertisement

Table of Contents
loading

This manual is also suitable for:

Alpha-36-g

Table of Contents