Removal Of Electrical Box - Daikin FLXS-BAVMB Service Manual

Floor / ceiling suspended dual type ba-series
Hide thumbs Also See for FLXS-BAVMB:
Table of Contents

Advertisement

Outdoor Unit - RK(X)S25/35G2V1B9, RXS25/35J2V1B
4.2

Removal of Electrical Box

Procedure
Step
Disconnect the
1
connector for the
overload protector
[S40].
2
Disconnect the
connector for the four
way valve coil [S80].
3
Disconnect the 2
connectors for the
reactor.
191
Warning Be sure to wait for 10 minutes or more after turning off all power
supplies before disassembling work.
Procedure
Points
Preparation
Remove the panels and
disconnect the connector for
the fan motor according to
the "Removal of Outer
Panels / Fan Motor".
[S40]
(R11846)
[S80]
(R11848)
(R11844)
Removal Procedure
SiBE05-722_B

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents