Removal Of Electrical Box - Daikin FLXS-BAVMB Service Manual

Floor / ceiling suspended dual type ba-series
Hide thumbs Also See for FLXS-BAVMB:
Table of Contents

Advertisement

Outdoor Unit - RK(X)S25/35G2V1B
3.2

Removal of Electrical Box

Procedure
Step
Disconnect the 2
1
connectors for the
reactor.
2
Cut the clamps at 2
locations.
Disconnect the
3
connector for the
compressor [S30].
165
Warning Be sure to wait for 10 minutes or more after turning off all power
supplies before disassembling work.
Procedure
[S30]
Points
Preparation
Remove the panels and
disconnect the connector for
the fan motor according to
the "Removal of Outer
Panels / Fan Motor".
(R9338)
(R9339)
When reassembling, coil the
excessive lead wire and
hang the loop on the hook.
(R9340)
Removal Procedure
SiBE05-722_B

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents