9.3.2.3
Concluding steps
Perform the following procedures:
"Installing the server node in the server enclosure" on page 50
Ê
Ê If applicable, reconnect all external cables.
"Controls and indicators on the server node" on page 51
Ê
"Enabling SVOM boot watchdog functionality" on page 72
Ê
9.3.3
Replacing the UFM board
Upgrade and Repair Unit
(URU)
Tools: tool-less
– combination pliers and flat nose pliers
– Phillips PH1 / (+) No. 1 screw driver
9.3.3.1
Preliminary steps
Perform the following procedures:
"Disabling SVOM boot watchdog functionality" on page 54
Ê
Ê Locate the desired server with the ID button.
"Shutting down the server node" on page 39
Ê
Ê If applicable, remove all external cables from the server node.
"Removing the server node from the server enclosure" on page 40
Ê
9.3.3.2
Removing the UFM
Ê Remove the UFM as described in section
page
170.
CX2550 M1
Upgrade and Maintenance Manual
System board and components
Hardware: 5 minutes
"Removing the UFM board" on
171