Removing The Ufm Board; Preliminary Steps - Fujitsu PRIMERGY CX2550 M1 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY CX2550 M1:
Table of Contents

Advertisement

Ê Download the desired ESXi Recovery CD ISO image, listed under Tools.
Ê Unpack and burn the image to a CD.
Ê Ensure that no other USB storage device is connected to the server beside
the UFM.
Ê Insert the Recovery Tools CD into your CD / DVD drive and reboot the
server.
The server should now boot from the Recovery Tools CD.
Ê Follow the on-screen instructions to initiate the installation.
After the flash process is complete, you will be asked to reboot the system.
I
For the Japanese market, follow the instructions provided separately.
9.3.2

Removing the UFM board

Upgrade and Repair Unit
(URU)
Tools: – tool-less
– Phillips PH1 / (+) No. 1 screw driver
9.3.2.1

Preliminary steps

Perform the following procedures:
"Disabling SVOM boot watchdog functionality" on page 54
Ê
Ê Locate the desired server with the ID button.
"Shutting down the server node" on page 39
Ê
Ê If applicable, remove all external cables from the server node.
"Removing the server node from the server enclosure" on page 40
Ê
CX2550 M1
Upgrade and Maintenance Manual
System board and components
Hardware: 5 minutes
169

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents