Concluding Steps - Fujitsu PRIMERGY CX2550 M1 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY CX2550 M1:
Table of Contents

Advertisement

Expansion cards
6.4.1.3

Concluding steps

Perform the following procedures:
Ê If applicable, re-install the expansion cards as described in section
"Installing expansion cards" on page
"Installing the server node in the server enclosure" on page 50
Ê
Ê If applicable, reconnect all external cables.
"Controls and indicators on the server node" on page 51
Ê
116
Upgrade and Maintenance Manual
108.
CX2550 M1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents