Ce Conformity - Fujitsu PRIMERGY CX2550 M1 Upgrade And Maintenance Manual

Hide thumbs Also See for PRIMERGY CX2550 M1:
Table of Contents

Advertisement

Notes on installing the server in the rack
For safety reasons, at least two people are required to install the server
in the rack because of its weight and size.
(For the Japanese market, please refer to " 安全上のご注意 ".)
Never lift the server into the rack using the handles on the front panel.
When connecting and disconnecting cables, observe the relevant
instructions in the "Important Information" chapter of the technical manual
for the corresponding rack. The technical manual is supplied with the
corresponding rack.
When installing the rack, make sure that the anti-tilt protection is correctly
fitted.
For safety reasons, no more than one unit may be removed from the rack at
any one time during installation and maintenance work.
If several units are simultaneously removed from the rack, there is a risk that
the rack could tip over.
The rack must be connected to the power supply by an authorized specialist
(electrician).
If the server is integrated into an installation that draws power from an
industrial power supply network with an IEC309 type connector, the power
supply's fuse protection must comply with the requirements for non-
industrial power supply networks for the type A connector.
3.2

CE conformity

The system complies with the requirements of the EC directives
2004/108/EC regarding "Electromagnetic Compatibility" and
2006/95/EC "Low Voltage Directive" and the directive of the
European Parliament and Council 2011/65/EU. This is indicated
by the CE marking (CE = Communauté Européenne).
CX2550 M1
Upgrade and Maintenance Manual
Important information
35

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents