Heat & Glo PRIMO60 Installation Manual page 40

Table of Contents

Advertisement

Assemble Vent Sections
(SLP Only)
• Slide the gasket over the fi rst vent section and place it
fl ush to the appliance. This will prevent cold air infi ltration.
Secure with four screws. See Figure 6.1.
• Attach the included DVP-2SL adapter to the corresponding
DVP pipe section with two screws.
• Lock the vent components into place by sliding the pipe
section onto the collar.
• Align the seam of the pipe and seam of collar to allow
engagement. Rotate the vent component to lock into
place. Use this procedure for all vent components. See
Figure 7.5.
• Continue adding vent components, locking each
succeeding component into place.
• Ensure that each succeeding vent component is securely
fi tted and locked into the preceding component.
All outer pipe joints must be sealed with high temperature
silicone (300º F minimum continuous exposure rating)
or aluminum foil duct tape, including the slip section that
connects directly to the horizontal termination cap.
• Apply a bead of silicone sealant (300º F minimum con-
tinuous exposure rating) inside the female outer pipe
joint prior to joining sections. See Figure 7.1.
• Only outer pipes need to be sealed. All unit collar, pipe,
slip section, elbow and cap outer fl ues shall be sealed
in this manner, unless otherwise stated.
WARNING! Risk of Fire or Explosion! DO NOT break
silicone seals on slip sections. Use care when remov-
ing termination cap from slip pipe. If slip section seals
are broken during removal of the termination cap, vent
could leak.
Note: Align seams to engage pipe,
then rotate counterclockwise to lock
Figure 7.5 Adding Venting Components
Heat & Glo • PRIMO48, PRIMO48ST, PRIMO60, PRIMO60ST, PRIMO72, PRIMO72ST Installation Manual • 2310-970 Rev. L • 2/16
40

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Primo48Primo72Primo48stPrimo72stPrimo60st

Table of Contents