Download Print this page

Tools Required - REMEHA P 520 Assembly Instructions Manual

Hide thumbs Also See for P 520:

Advertisement

2 Mounting
Assemble the boiler in the order given by the numbers of each figure, in compliance with all the
Warning:
instructions
.
Refer to the applicable price list for any optional features used.

Tools required

- 1 JD-TE or JD-TE Plus assembly tool
- 1 Flat screwdriver
- 1 "n°2 posidrive" screwdriver
- 1 10, 13, 17, 19 spanners
- 1 22 tubular box spanner
- 1 27 tubular box spanner
- 1 electric screwdriver + 1 "n°2 Philipps" screwdriver bit
- 1 Stanley knife
- Silicone filler (Supplied)
Boilers supplied with an assembled body
- Hydraulic test: See fig. 18
- Mounting: start assembly from figure 35
Mounting the boiler body:
Assemble the boiler body from the rear to the front:
- assemble the rear section,
- assemble all the normal intermediate sections,
- assemble all the special intermediate sections,
- assemble the front section.
The number of sections of each type is provided in the table below
Section type
P 520-13
1
P 520-15
1
P 520-17
1
P 520-19
1
P 520-21
1
P 520-23
1
P 520-25
1
Rear section
Normal intermediate section
Special intermediate section
Front section
25/01/2012 - 300016864-001-C
8
10
12
14
15
17
19
P 520
3
3
3
3
4
4
4
1
1
1
1
1
1
1
5

Advertisement

loading