Download Print this page

REMEHA P 520 Assembly Instructions Manual page 18

Hide thumbs Also See for P 520:

Advertisement

2.
Ensure that all the air in the boiler is vented to avoid any bursting of the body.
3.
Maintain pressure for at least 10 minutes. Any drop in pressure indicates a leakage in the boiler body.
After the tightness test, drain the boiler and remove all the parts used for the test.
18
P 520
25/01/2012 - 300016864-001-C

Advertisement

loading