Download Print this page

REMEHA P 520 Assembly Instructions Manual page 29

Hide thumbs Also See for P 520:

Advertisement

35 Assembling the baffle plates
Boilers supplied with an assembled body
Put the baffle plates into place in the upper front flue ways, taking care to interlock them with each other before fitting them.
Boiler
Total number of baffle
Pack no.
36 Assembling the upper crosspieces - package RC2 or RC3
Boilers supplied with an assembled body
Mount the 2 crosspieces and fasten them onto the rods with an expansion spring, 2 nut and 2 washer.
25/01/2012 - 300016864-001-C
for boilers supplied with an assembled body only.
Only NL: Mounting of the low-water safety pressure
switch! (Refer to the leaflet "Mounting of the low-water
safety pressure sensitive switch" delivered in the package)
P 520-13
P 520-15 to P 520-19
4
CM 23
CM 22 + CM 23
Rear
Front
for boilers supplied with an assembled body only.
P 520
P 520-21 to P 520-25
6
2 x CM 23
8
29

Advertisement

loading