Download Print this page

REMEHA P 520 Assembly Instructions Manual page 26

Hide thumbs Also See for P 520:

Advertisement

30 Fitting the boiler outlet flange
Carefully insert the Ø 15 gasket in the groove of the rear section and hold it in place with a few drops of silicone.
31
Before assembling the flue gas box, grease all bolts, studs
and screws with high-temperature grease (not supplied).
Put the adhesive sheet gasket in place on the flue gas box.
Put the sweeping cover in place and fasten with 2 nuts H 10 and Ø 10 washers.
26
P 520
25/01/2012 - 300016864-001-C

Advertisement

loading