Commissioning; Switching Off The Boiler; Precautions Required In The Case Of Long Boiler Stops; Precautions Required If The Heating Is Stopped When There Is A Risk Of Freezing - REMEHA P 420 Installation And Service Manual

Fuel oil/gas boilers
Hide thumbs Also See for P 420:
Table of Contents

Advertisement

5 Commissioning

See:
- Control panel instructions.
- Burner instructions.
- Domestic hot water calorifier instructions.

6 Switching off the boiler

Set the On/Off switch to O.
See: Control panel instructions.

6.1 Precautions required in the case of long boiler stops

- The boiler and the chimney must be swept carefully.
- Close all the doors of the boiler to prevent air from circulating inside
the boiler.

6.2 Precautions required if the heating is stopped when there is a risk of freezing

We recommend the use of a correctly dosed antifreeze agent to
prevent to the heating circuit from freezing.
If this cannot be done, drain the system completely.
16
Cut the gas supply to the boiler (if present).
- We advise removing the pipe which connects the boiler to the
chimney and to close off the nozzle with a cover.
P 420
16/03/2016 - 300016839-03

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents