Download Print this page

REMEHA P 520 Assembly Instructions Manual page 12

Hide thumbs Also See for P 520:

Advertisement

12
Trim off any projecting ends of the thermocords the sweeping covers.
13 Fitting the upper and lower assembly rods
On the lower assembly rods, fit the following at each end in the given order : an expansion spring, a washer and a nut (the holes of the
front lugs must be aligned with the holes of the frame brackets as the assembly rods are used to make the boiler body integral with the
frame).
Stop tightening as soon as the gap between the spring spires is equal to about 2 mm.
12
P 520
25/01/2012 - 300016864-001-C

Advertisement

loading