Download Print this page

Flame Inspection Window - REMEHA P 520 Assembly Instructions Manual

Hide thumbs Also See for P 520:

Advertisement

27 Flame inspection window

The flame inspection window is fitted with a 1/4" tapped hole for ventilation (optional): if a ventilation system is used, connect the hole to
the one provided for that purpose before the burner combustion head.
28 Assembling the return flange on boilers P 520-13 to P 520-25
P 520-13: Package FA 67
P 520-13: Package FA 48
P 520-15 to P 520-25: Package FA 69 to FA 79
P 520-15 to P 520-25: Package FA 50 to FA 60
P 520-13
Fit the water balancing diaphragm with the notches vertical onto the
boiler return with a Ø 170x222 gasket in between (first soak the
gasket in warm water).
Fit the heating return flange with a Ø 170x222 gasket in between and
fix it with 4 nuts H 18.
24
P 520
25/01/2012 - 300016864-001-C

Advertisement

loading