5 Hydraulic connections
5.1 Dimensional information required
Draining outlet 3/4''
Heating return:
- 13 to 17 sections: 139.7 - 5''
- 18 to 25 sections: 159 - 6''
weld.
Heating flow:
- 13 to 17 sections: 139.7 - 5''
- 18 to 25 sections: 159 - 6''
weld.
P 520-13
C (mm)
1488
D (mm)
256
H (mm)
37
14/06/2012 - 300016859-001-01
P 520-15
P 520-17
1488
1488
188
210
-31
-9
* dimension without connection (see figure on chapter Boiler location,
straight or angled connection).
P 520-19
P 520-21
1504
1504
257
209
13
-35
P 520
P 520-23
P 520-25
1504
1504
231
253
-13
9
11