Hitachi DZ-MV350A Service Manual page 96

Hide thumbs Also See for DZ-MV350A:
Table of Contents

Advertisement

Adjustment > Setups for Adjustment
(2) Setting test equipment
The names of switches, etc. of test equipment may vary depending on the manufacturer and model.
Some switches in addition to those shown below may have to be set: See the instruction manual of
test equipment for details.
1) Oscilloscope
a) Probe:
b) V-MODE:
b) TIME/DIV:
c) VOLTS/DIV:
d) TRIGGER SOURCE: CH1 (except where some other designation is given)
e) AC/DC/GND:
2) Vectorscope
a) SATURATION:
10:1
CH1 (except where some other designation is given)
10 or 20 µs (except where some other designation is given)
Change depending on the measurement object
AC
75%
6 - 15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dz-mv350a(k)

Table of Contents