Tower Assembly Guide - Peak Pilates AFINA Owner's Manual And Assembly Manual

Table of Contents

Advertisement

TOWER ASSEMBLY GUIDE

If you have ordered the Afina™ Reformer with the tower kit, most components for
the tower will arrive in a separate box. It contains additional items (detailed in the
"What's Inside" section). The following pages will detail all of these components and
the steps required for installation.
Tower Bracket Assembly
Fig. 10
Fig. 11
Fig. 12
Fig. 13
The first step toward assembling the
tower is installation of the tower brackets
on the head end of the reformer frame.
Please find the instructions for installing
these mounts below:
1. Place the plastic caps into the
bottom of each tower bracket (Fig.
10).
2. Align the four holes at the outside
end of the reformer frame with the
four holes on the long edge of the
tower bracket.
Note: the bowed edge of the tower
bracket must be on the outside edge
of the frame. (Please refer to Fig.
11.)
3. Insert the tower bracket block into
the tower bracket and align it with
the four holes (Fig. 12).
4. Insert the 50 mm screws with two
washers (one small and one large
as shown in Fig. 13) per screw into
the holes on the inside of the frame
to affix the tower bracket and tower
bracket block to the frame. Screw
in the 50 mm screws until they are
finger tight.
18
PEAK PILATES
®

Advertisement

Table of Contents
loading

Table of Contents