a lateral side of the UPS, one person hold the other lateral side of the UPS with their
hands, and one person use their hands to push the UPS either from the front side or
from the backside to move the unit to the installation area and avoid tipping the UPS.
y
If you need to move the UPS over a long distance, please use appropriate equipment
like a forklift. Do not use the UPS casters to move the unit over a long distance.
5.4

Fixing the UPS

Please follow the steps below:
1
%HIRUH ¿[LQJ WKH 836 LQ D GHVLJQDWHG DUHD SOHDVH GRXEOH FKHFN ZKHWKHU WKH DUHD¶V
ÀRRU ZHLJKW ORDGLQJ LV VXI¿FLHQW WR EHDU WKH 836 DQG H[WHUQDO EDWWHU\ FDELQHWV WR DYRLG
accidents. Please refer to Table 5-1.
2
After the UPS is moved to the designated area, stabilize the four leveling feet on the
ÀRRU 3OHDVH QRWH WKDW WKH 836 PXVW VWDQG RQ WKH ÀRRU VWDEO\ DQG OHYHOO\ ZLWKRXW DQ\
tipping.
3
Use a 16mm socket wrench and four M10 screws
supports on the pallet) to install the two balance supports (removed during the
unpacking process) at the front of the UPS. Use two expansion screws
balance supports on the ground to avoid UPS movement. Service personnel should
provide the expansion screws. Please see Figure 5-2.
4
Use a 16mm socket wrench and four M10 screws
supports on the pallet) to install the two balance supports (removed during the
unpacking process) at the back of the UPS. Use two expansion screws
balance supports on the ground to avoid UPS movement. Service personnel should
provide the expansion screws. Please see Figure 5-3.
Modulon DPH Series 25-150 kW
o
n
M10 Screw
(Figure 5-2 : Balance Support Installation/ Front)
5 - 4
n
RULJLQDOO\ XVHG WR ¿[ WKH EDODQFH
(Front View)
o
n
n
RULJLQDOO\ XVHG WR ¿[ WKH EDODQFH
o
WR ¿[ WKH
Ground
Balance Support
Expansion Screw
o
WR ¿[ WKH