Hangar 9 Alpha 40 ARF Assembly Manual page 14

Hide thumbs Also See for Alpha 40 ARF:
Table of Contents

Advertisement

Step 8
Use four 8-32 x 3/4-inch socket head screws to attach
the motor to the motor standoffs. Remember to use
threadlock on the screws so they don't vibrate loose. The
wires from the motor will go into the fuselage through the
large hole in the firewall.
Step 9
Prepare the speed control with the necessary connectors
to connect it to your choice of battery and motor. Follow
the instructions provided with the speed control to
complete this step.
14
Step 10
Place a piece of hook and loop tape on the bottom of the
speed control. Leave the backing on the mating piece of tape
until instructed to remove.
Step 11
Connect the leads from the motor to the speed control. If
you are using E-flite components, the colors will match
from the speed control and motor. If you are using other
components you may need to change the motor wires later
when checking the operation of the motor.
Step 12
Use a hobby knife to remove the covering from the opening
in the side of the fuselage for the speed control switch. Use
the hardware provided with the speed control to mount the
switch in the side of the fuselage.
Step 13
Position the speed control in the fuselage as shown. It will
be secured once the battery trays have been installed.
Hangar 9 Alpha 40 ARF Assembly Manual

Advertisement

Table of Contents
loading

Table of Contents