Installation Of Fire; Unpacking The Fire; Marking The Flue Pipe Opening - Flavel FVPC**MN Installation, Maintenance & User Instructions

Kenilworth & linear powerflue fuel effect gas fures
Table of Contents

Advertisement

2.1

UNPACKING THE FIRE

Carefully lift the fire out of the carton. Remove the loose item packaging carefully
from the front of the appliance. Check the contents as listed :-
Packing Check List - All Models
1 off
Fire box / burner assembly & standard flue pipe
1 off
Boxed fuelbed base, ceramic front rail and 18 synthetic coals or 14
synthetic pebbles
1 off
Loose items bag including isolation valve and olive.
1 off
Installation, maintenance & user instruction book (combined)
1 off
Fret / Ashpan cover
1 off
Trim
1 off
Rope seal, fan box clamping plate, fan spigot & fixing screws (packed in
loose items)
1off
Boxed fan unit (Pack 2 of 2)
2.2
MARKING THE FLUE PIPE OPENING ON THE WALL (ALL MODELS)
Drill a pilot hole into the outer leaf of brickwork at a height of 482mm from the
hearth level, centrally about the firebox, then create a square hole 100mm / 4 inch
vertically central to the centre line of the appliance. See fig. 8 below.
NOTE :
If the fire is to be fitted against the inner cavity wall, the inner and
outer cavity walls will require the 100mm / 4 inch hole creating
IMPORTANT NOTE
Fig. 8
DO NOT FIT THIS APPLIANCE FAN UNIT ABOVE A HEIGHT OF
1.4M FROM GROUND LEVEL
100mm / 4 inch
square hole
Inner
Cavity Wall
Outer
Cavity Wall
SECTION 2

INSTALLATION OF FIRE

: :
10
MAXIMUM
1.4 METRE
482mm to Centre
of Flue Pipe from
bottom of opening

Advertisement

Table of Contents
loading

This manual is also suitable for:

Fvpp**mn

Table of Contents