2.1
UNPACKING THE FIRE
Carefully lift the fire out of the carton. Remove the loose item packaging carefully
from the front of the appliance. Check the contents as listed :-
Packing Check List
1 off
Combustion chamber and glass frame assembly
1 off
Loose items bag including :-
1 off Remote control handset
1 off 6mm Allen key
1 off each User instruction book and Installation book
4 off 1.5V Batteries
1 off Spigot & fitting screws
1 off valve cover
2 off M5 screws (to fit fascia to base brackets)
1 off
Kamina Fascia
1 off
Closure Plate
2.2
INSTALLING THE COMBUSTION CHAMBER & CLOSURE PLATE
Establish which type of flue you are intending to install the fire in to :-
225 x 225mm (9 inch x 9 inch) brick built chimneys
175mm (7 inch) diameter lined brick or stone flue, or insulated pre-fabricated
metal flue box to B.S. 715.
When installing into 125mm (5 inch) diameter lined brick or stone flue, or
insulated pre-fabricated metal flue box to B.S. 715 and pre-cast flues the
restrictor baffle must not be fitted.
A spillage test must always be carried out to check satisfactory
clearance of flue products, regardless of the type of flue the
appliance is being fitted to.
PLEASE NOTE :- IF INSTALLING THIS PRODUCT INTO A HOLE IN THE WALL
TYPE INSTALLATION IN WHICH THE FLUE TYPE IS PRE-CAST, SPECIALIST
ADVICE MUST BE OBTAINED FROM A STRUCTURAL ENGINEER
REGARDING THE RE-POSITIONING OF THE STARTER BLOCKS.
UNDER NO CIRCUMSTANCES SHOULD THE FIRE BE RECESSED INTO THE
GATHER BLOCK, OFFSET OR STRAIGHT FLUE BLOCKS.
SECTION 2
INSTALLATION OF FIRE
10