Attaching Top Insulation
Layers –ZC Models only
1.
For top vent outlet appliances cut out a
circle at the center of the insulation
layers for the vent collar.
2.
Place both the insulation layers on top
of the appliance case inboard of the
stand-off spacers. See figure 51.
!Warning: Failure to install both the
insulation layers may cause a fire hazard
and voids warranty.
8.12. Appliance Wall or Floor
Fixing – President FS only
The President FS can be secured to the wall
and/or floor if required. The fixing positions
are shown in figure 4. Holes should be
drilled in the wall or floor and the holes
plugged at this stage. Position the appliance
accurately in its final location. Mark
through the two fixing holes in the
appliance base and/or the holes near the top corners at the back. Plug the holes if necessary. Don't fix the appliance at this
stage. Wait until the vent pipes are installed.
Figure 51