Secure Foundation Plate - Centsys D5-Evo Installation Manual

Light-industrial sliding gate operator
Hide thumbs Also See for D5-Evo:
Table of Contents

Advertisement

Option 2: Existing concrete plinth
3. If bolting onto an existing concrete
plinth, place the foundation plate down in
the correct position and use the plate as
a template for marking the rawl bolt
holes.
4. Assemble foundation plate without
anchor brackets before bolting down onto
plinth.
Ensure that the M10 gearbox
mounting bolts are properly
tightened.
Route cables and secure foundation plate
1. Route cables as determined in Section 8, Cabling requirements.
2. Make sure that all cables and conduits
protrude at least 400mm above the
baseplate once installed as shown in
Figure 14.
Make sure that the M10 bolts,
which secure the gearbox, are in
place.
3. Securely concrete or bolt the foundation
plate in position.
M10 nut
M10 washer
page 19
M10 gearbox
mounting bolts
Use two M12
plated nuts as spacers
M10 x 95
expansion stud
FIGURE 13
M10
mounting
bolts
FIGURE 14

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents