Suzuki GSX1300R Manual page 492

Suzuki gsx1300r motorcycle
Hide thumbs Also See for GSX1300R:
Table of Contents

Advertisement

3A-10 Drive Chain / Drive Train / Drive Shaft:
Joint pin staking
1) Set up the special tool as shown in the figure.
5
4
1. Tool body
2. Grip handle
3. Pressure bolt [A]
4. Adjuster bolt (Without hole)
5. Staking pin (Stowed inside grip handle behind rubber cap)
6. Bar
NOTE
Before staking the joint pin, apply a small
quantity of grease to the staking pin (5).
3
1
2
6
I649G1310034-02
2) Stake the joint pin by turning (approximately 7/8 turn)
the pressure bolt [A] (3) with the bar until the pin end
diameter becomes the specified dimension.
CAUTION
!
• After joining of the chain has been
completed, check to make sure that the
link is smooth and no abnormal condition
is found.
• Should any abnormal condition be found,
reassemble the chain link using the new
joint parts.
Pin end diameter specification "a"
RK: 5.55 – 5.95 mm (0.219 – 0.234 in)
3) Adjust the drive chain slack, after connecting it.
Refer to "Drive Chain Inspection and Adjustment in
Section 0B (Page 0B-15)".
3
I649G1310035-02
"a"
I649G1310036-03

Advertisement

Table of Contents
loading

Table of Contents