Exterior Parts - Suzuki GSX1300R Manual

Suzuki gsx1300r motorcycle
Hide thumbs Also See for GSX1300R:
Table of Contents

Advertisement

0B-4 Maintenance and Lubrication:
Valve Clearance Inspection and Adjustment
Inspect valve clearance
Initially every 24 000 km (14 500 miles, 48 months)
Inspection
Valve clearance adjustment must be checked and
adjusted, a) at the time of periodic inspection, b) when
the valve mechanism is serviced, and c) when the
camshafts are removed for servicing.
1) Remove the side cowlings. Refer to "Exterior Parts
Removal and Installation in Section 9D (Page 9D-
14)".
2) Lift and support the fuel tank. Refer to "Fuel Tank
Removal and Installation in Section 1G (Page 1G-
9)".
3) Remove the air cleaner box. Refer to "Air Cleaner
Box Removal and Installation in Section 1D
(Page 1D-6)".
4) Remove the right side cowling bracket (1).
5) Disconnect the right cooling fan lead wire coupler (2)
and horn lead wire coupler (3).
2
B815H20206004
1
I815H1020004-01
3
I815H1020005-03
6) Remove the ignition coil/caps (4) and spark plugs.
Refer to "Ignition Coil / Plug Cap and Spark Plug
Removal and Installation in Section 1H (Page 1H-
6)".
7) Remove the PAIR control solenoid valve (5) and
PAIR hoses. Refer to "PAIR Control Solenoid Valve
Removal and Installation in Section 1B (Page 1B-
10)".
8) Disconnect the ISC valve coupler (6) and CMP
sensor coupler (7).
5
7
9) Loosen the throttle body clamp screws at the intake
pipe side. Refer to "Throttle Body Removal and
Installation in Section 1D (Page 1D-10)".
10) Move the throttle body assembly backward.
4
6
I815H1020006-01
I815H1020008-01

Advertisement

Table of Contents
loading

Table of Contents