Door Hold Open Link Installation; Inside Channel Molding Removal; Inside Channel Molding Installation - Daewoo Nubira Owner's Manual

1998-2001 nubira
Hide thumbs Also See for Nubira:
Table of Contents

Advertisement

9P – 30IDOORS
Installation Procedure
Notice : Dissimilar metals in direct contact with each other
may corrode rapidly. Make sure to use the correct fasten-
ers to prevent premature corrosion.
1.
Install the door hold open link to the door and the
body with the bolts.
Tighten
Tighten the door hold open link–to–body bolt to 27
NSm (20 lb–ft).
Tighten the door hold open link–to–door bolts to 6
NSm (53 lb–in).
2.
Reposition the door seal trim.
3.
Install the door trim panel. Refer toSection 9G, Inte-
rior Trim.
INSIDE CHANNEL MOLDING
Removal Procedure
1.
Remove the door trim panel. Refer to Section 9G,
Interior Trim.
2.
Straighten the retaining tabs in order to release the
channel molding from the door trim panel.
3.
Remove the channel molding.
Installation Procedure
1.
Install the channel molding onto the door trim panel.
2.
Bend the retaining tabs to secure the channel mold-
ing to the door trim panel.
3.
Install the door trim panel. Refer to Section 9G, In-
terior Trim.
DAEWOO V–121 BL4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents